Technical indicators
Description: | 2015 | 2016 | Change | Q4 2015 | Q4 2016 | Change |
---|---|---|---|---|---|---|
SAIDI unplanned interruptions including catastrophic ones (HV, MV) [minutes] | 434.07 | 244.44 | -43.69% | 72.73 | 46.53 | -36.02% |
SAIDI unplanned interruptions including catastrophic ones (HV, MV) [pcs] | 5.50 | 3.85 | -30.00% | 1.09 | 0.86 | -21.10% |
% of contract performance in the reference term 18 months (group IV) [%] | 82.40% | 88.90% | 6.50 p.p. | 77.78% | 94.67% | 16.89 p.p. |
% of contract performance in the reference term 18 months (group V) [%] | 89.71% | 95.98% | 6.27 p.p. | 90.44% | 97.20% | 6.76 p.p. |
Other technical indicators
Description: | 2015 | 2016 | Change | Q4 2015 | Q4 2016 | Change |
---|---|---|---|---|---|---|
Grid losses index [%] | 6.86 | 6.28 | -0.58 p.p. | 9.73 | 8.81 | -0.92 p.p. |
Sales of distribution services
Description: | 2015 | 2016 | Change | Q4 2015 | Q4 2016 | Change |
---|---|---|---|---|---|---|
Sales of distribution services [GWh] | 17 936 | 18 741 | 4.49% | 4 545 | 4 817 | 5.98% |
RAB, number of customers
Description: | 2015 | 2016 |
---|---|---|
RAB [PLN ‘000] | 6 910 924 | 7 252 486 |
Number of customers [pcs] | 2 487 023 | 2 520 175 |
103.12 - Length of power lines 1) [‘000 km]
37.61 - Number of transformer stations [‘000 pieces]
809.81 - Number of connections 1) [thou. of pieces]
18.16 - Length of connections 1) [‘000 km]
1) The discrepancies between the figures presented in 2015 and 2016 stem from the fact that the said data for 2016 was collected from GIS, containing the information on the size of Enea Operator’s grid after the passporting completed in 2016. A drop in the number of connections stems from the fact that, as a result of conducted passporting some connections were classified as a low-voltage grid. On the other hand, reducing the length of connections stems from the fact that these figures are currently presented based on their graphical lengths included in the system.